Bathrooms guide

How Much Does a New Bathroom Cost in 2026? London Prices

A new bathroom in London costs from £3,850 for a basic refit and about £9,200 to £27,600 for a full job. Here is what moves the price, what is included and how to read a quote.

Updated By the Plumbery editorial team

Use the cost calculatorCall 07353 373753

A new bathroom in London starts from £3,850 for a basic refit on the same layout. A small bathroom with a standard finish is about £9,200, a mid-range 5 m² family bathroom about £12,700, and a large premium bathroom about £27,600. These are Plumbery guide prices including VAT. Moving the toilet, a wet room, underfloor heating and problems found behind the walls all push the figure up.

The prices below come from our own published price list and cost guide, last checked on 22 November 2026. They are guide prices, not a quote. A written estimate follows a survey of your actual room.

How much does a new bathroom cost in London in 2026?

Four examples show the usual range. The first is our basic starting package; the other three are full refits: strip-out, new suite, tiling, plumbing, electrics, fitting and materials.

BathroomGuide price including VATRange including VAT
Starting package: basic refit, same layout, white 3-piece suitefrom £3,850not a range, a starting price
Small, 4 m², standard finish£9,200£8,200 to £10,600
Medium, 5 m², mid-range finish£12,700£11,200 to £14,600
Large, 8 m², premium finish: freestanding bath and separate walk-in shower, wall-hung WC, 2 basins, underfloor heating£27,600£24,200 to £31,700

Source: Plumbery price list and our London renovation cost guide, data dated 11 October 2026. The examples include fitting, materials and sanitaryware. Our calculator counts upgrades such as underfloor heating and a wall-hung WC as separate extras, so its range for a large premium bathroom can be lower than the full example above.

The spread inside each range is real. Two bathrooms of the same size can differ by a few thousand pounds because of the tiles chosen, the shower type and what the walls and floor turn out to need.

Why is the “from £3,850” bathroom not the price most people pay?

The starting package is a deliberately basic job. It covers strip-out and disposal, a white 3-piece suite (bath, basin and toilet) with taps, a bath screen and shower mixer, standard ceramic tiles around the bath and basin, vinyl flooring, an extractor fan, basic lighting, and all plumbing and electrical connections. The layout stays as it is.

Many homeowners want more than that. A walk-in shower, full-height tiling, a vanity unit or a heated towel rail each move the job into the guide-price bands in the table. If your bathroom is small, plain and staying in the same layout, the starting price is a fair guide. If not, plan around the guide prices.

When you compare any two quotes, check that they describe the same job. A low headline figure and a full specification are often not the same thing.

How does the finish level change the price?

For a 5 m² bathroom, our 2026 cost guide gives about £10,700 for a standard finish, about £12,700 for mid-range and about £16,300 for premium, all including VAT. The same room, the same plumbing, a difference of roughly £5,600 between the top and the bottom.

The finish mainly changes the sanitaryware and tiles. Our bathroom cost calculator works the same way: the finish level alters the suite and tile choice, and everything else is counted separately.

What else changes the price of a bathroom?

Size and finish set the base. These items then add to it:

  • Moving the toilet or the soil pipe. In our cost guide a toilet or soil pipe move is about £2,160 including VAT. The toilet needs a workable route to the soil stack with enough fall. Where gravity drainage is not possible, a macerator or pump can be used, which is another cost.
  • Wet room or walk-in shower. The floor is built to the correct fall, tanked, fitted with a drain and tiled, then leak-tested. That is more labour than a standard tray.
  • Tiling extent. Floor only, half-height walls or full walls are three very different jobs. Large-format tiles and full-height tiling are listed as popular upgrades.
  • Underfloor heating, heated towel rail, concealed cisterns, wall-hung toilet. Each is an upgrade and each is itemised in a written estimate.
  • Electric shower, shower pump, new window, new partition walls. The calculator counts these separately.
  • Replastering. Not in the starting price. Needed more often in older London houses.

Hidden problems are the biggest unknown. Rot, damp, asbestos and old or substandard wiring cannot be priced until the walls and floor are open, so they are priced separately after the survey. A reasonable estimate says so up front.

What is included and what is not?

This is the scope our bathroom cost calculator assumes for a full refit. The examples in the table can include more: the large premium bathroom includes underfloor heating and a wall-hung WC. Use the list on any quote you receive.

Included in a full refit budget:

  • Strip-out and waste removal
  • Plumbing and waste pipework
  • Wall tiling and a tiled floor
  • Basin with vanity unit, close-coupled toilet, towel rail
  • Spotlights and extractor fan
  • Electrics with a certificate
  • Plastering and decorating

Not included unless you ask for it:

  • Moving the toilet or soil pipe, a wall-hung toilet, concealed fittings, a wet room, underfloor heating, an electric shower
  • Drawings, structural engineers, planning fees and party wall surveyors
  • Bathroom furniture and accessories
  • Curtains, blinds, decorative bulbs and loose appliances
  • Structural problems found after opening up
  • Parking permits and congestion charge, which are charged at cost

If you supply your own suite or tiles, the cost of those items is deducted and they need to be on site before work starts.

What should a good bathroom quote look like?

You should be able to answer four questions from the paperwork alone.

  1. What is the scope? Room size, layout change or not, shower type, tiling area, and which fittings are included.
  2. Are labour and materials separate? Our estimates list materials separately, with labour charged at published hourly rates.
  3. Is VAT stated? Prices to homeowners should say whether VAT is included. Ours are shown including VAT.
  4. What is excluded, and what happens if something hidden turns up? Look for a line on damp, rot or wiring found after strip-out.

A survey comes first. At ours, the room is measured and the soil stack, waste falls, water pressure, electrics and ventilation are checked, so the estimate reflects the room you have.

Do you need building regulations approval for a new bathroom?

Often not for a like-for-like replacement. Under Part P of the Building Regulations, a new circuit, a new consumer unit, or any addition or alteration to circuits in the zone around a bath or shower is notifiable: it must be self-certified by a registered electrician or notified to building control. Adding a bathroom or changing its ventilation brings in the Part F ventilation rules, and moving a toilet or adding new drainage can need building control under Part H. The government explains when notification of electrical work is required in Approved Document P, and sets out ventilation requirements in Approved Document F.

This is general information for homes in England, correct at the date shown. It is not legal, planning or engineering advice for your property. Do not attempt notifiable electrical work yourself. Our electricians test the electrical work and issue an electrical installation certificate, and the estimate says how any notifiable work will be signed off.

How can you spend less without cutting corners?

  • Keep the layout. Leaving the toilet and bath where they are avoids the cost of a pipe move, about £2,160 in our guide.
  • Choose a standard finish for the parts you will not notice daily. The finish level changes only the sanitaryware and tiles, so a plain suite with good plumbing is a sensible place to save.
  • Decide before work starts. Colours, tiles and fittings agreed at the survey stage avoid changes once materials are ordered.
  • Supply your own items if you have found a good price. The cost is deducted from the estimate. Order early so they are on site.
  • Do not remove the safety work. Tanking, extraction and electrical certification are what make a bathroom last.

How do you get a price for your own bathroom?

Start with the bathroom renovation cost calculator. It takes a few minutes and gives a range including labour, materials and VAT for your room size and finish. Then read about how we work on our bathroom refurbishment page and book a survey for a written estimate.

If you want the room designed first, bathroom design with three 3D views starts from £1,240 including VAT, and is credited in full against a Plumbery installation of £12,500 or more including VAT if you sign the build contract within 6 months of receiving the design. See the design page for the terms. Hourly rates for smaller jobs are on the pricing page.

Plumbery LTD provides this service, so treat this guide as the view of a company that fits bathrooms. We have shown our prices, dates and sources so that you can check them.

FAQ

How much does a small bathroom cost in London?

Our guide price for a small 4 m² bathroom with a standard finish is £9,200 including VAT, within a range of £8,200 to £10,600. A basic refit on the same layout starts from £3,850 including VAT.

Is a new bathroom cheaper if I keep the same layout?

Yes. Moving the toilet or soil pipe is about £2,160 including VAT in our cost guide, and layout changes can also mean new waste routes and replastering, which are priced separately.

Are your bathroom prices including VAT?

Yes. Our project and starting prices include VAT at 20%. Hourly rates for smaller jobs are listed on the pricing page.

Why do bathroom quotes vary so much?

Quotes differ in scope, in the sanitaryware and tiles allowed for, and in how hidden problems are handled. Ask each company to price the same specification, then compare what is excluded.

Can I buy my own suite and tiles?

Yes. You can buy your own, and we will fit them. The cost of items you supply is deducted from the estimate, and they must be on site before work starts.

How long does a new bathroom take?

For a typical London family bathroom, about 7 to 12 working days on site, plus time for tiles and sanitaryware to arrive. Read more in how long a bathroom renovation takes.

By the Plumbery editorial team. Prices come from our published rates and cost calculators, include VAT unless stated, and were checked on . Every home is different, so we confirm the final price in a written quote after a survey.

Keep reading

More renovation guides