Design & Drawings
Design & Drawings: plans, 3D and interiors for London homes
We measure your home ourselves, then produce the drawings the council and building control ask for, or a bathroom, kitchen or interior design you can price and build. Because the same company builds, the drawings are drawn around what can actually be built and fitted.
Call 07353 373753Get a design quote
- Measured on site by our own team
- Planning, building regulations and 3D
- Part or all of the fee credited if we build (conditions apply)
What we do
Drawings and design for homes in London and the surrounding counties
Design & Drawings is the design side of Plumbery. It covers the paperwork that lets a project start (planning drawings, building regulations drawings) and the design work that decides how a room will look and function (bathroom, kitchen and interior design with 3D views).
You can buy any part on its own and build with another company. Many clients who come to us for a rear extension, a loft or a bathroom prefer one contract, so the drawings are written for the people who will build from them: our own team and the registered trades we work with.
Four services
Choose the drawings or design you need
Planning drawings
Location plan, block plan, existing and proposed plans, elevations and sections for rear extensions, side returns, lofts and garage conversions, plus certificate-of-lawfulness and prior approval packs. See planning drawings
Building regulations drawings
Construction details, specification, fire, ventilation and drainage layouts that building control checks before and during the build, with beam design left to an independent structural engineer. See building regulations drawings
Bathroom and kitchen design
A measured layout, wall elevations, tile layout, fittings schedule, lighting and 3D views, ready to price and install. See bathroom and kitchen design
House and interior design
Room, flat or whole-house design: layout, concept, materials, lighting, a specification and a shopping list, plus support while the work goes on. See house and interior design
Two sets of drawings
Planning drawings and building regulations drawings: what each one does
Planning drawings
- Show the council how the building looks and what it does to the neighbours.
- Needed for a householder application; permitted development projects can use a certificate or prior approval pack instead.
- Location plan, block plan, plans, elevations and sections.
Building regulations drawings
- Show building control how it will be built: structure, insulation, fire, ventilation and drainage.
- Needed for almost every extension and every loft conversion, even when planning permission is not.
- Construction details, specification and the structural engineer interface.
Prices at a glance
Starting prices, inc VAT
Prices include VAT at 20%. Your written quote confirms the final figure after we have seen the property. Council, Planning Portal and building control fees, and any structural engineer or party wall surveyor, are extra and paid by you directly to them.
How it works
From first call to the first brick
Brief
We ask what you want, who lives in the house, your budget band and your start date, and check the address for conservation area, Article 4 and listed status.
Measured survey
One of our team visits and measures every room, wall thickness, window, level change, stair and drain position. No planning, building regulations, bathroom or kitchen drawing is started from guesses or from online floor plans.
Design
You get two or three layout options with a recommendation, a rough cost indication and the planning route each one needs.
Drawings
We produce the sheets for the chosen option, check them against our own list of the reasons councils return applications, and include two rounds of changes.
Submission support
You are the applicant. With your written authority we can submit the application through the Planning Portal or to building control on your behalf. You pay the council fee and sign the ownership certificate.
Build
If you choose us, the drawings go straight to the people who will build, with a fixed written quote based on them.
Why one team
One team for drawings and build means fewer gaps to fall into
A common failure on a London extension is a drawing nobody built from. The drainage runs under a wall the builder cannot move, the boiler flue exits 200 mm from a window, or the kitchen island fits on paper but leaves 700 mm to walk past. A designer who also builds hears about those problems before the sheets are issued, not on day three of the build.
It also means one party answers for the result. Under CDM 2015 and Part 2A of the Building Regulations 2010, a domestic project with more than one contractor needs a principal designer and a principal contractor. When we draw and build, we take both roles in writing, so you are not left to find out which of three companies owns a mistake.
Build credit
Part or all of your design fee comes off the build
Build with us and your design fee comes off the build price, in part or in full. Bathroom or kitchen design: we credit 100% of the design fee against a bathroom or kitchen installation by Plumbery of £12,500 or more (inc VAT), or 50% against an installation from £6,500 (inc VAT). Planning and building regulations drawings: we credit 50% of the drawings fee against a build contract of £25,000 or more (inc VAT), or 100% from £60,000 (inc VAT); the drawings credit is capped at 5% of the build contract price. The credit is worked out on the fee you actually paid for the design or drawings, including any survey fee already credited into it. The build contract must be signed within 6 months of delivery of your design or drawings. The credit is shown as a discount on your build invoice; it is not cash, cannot be refunded or transferred, and applies once per property. If you cancel the build contract, the credit is cancelled too. Council, Planning Portal and building control fees, and fees of independent engineers or party wall surveyors, are not credited. Your statutory cancellation rights are not affected. A measured survey bought on its own is credited in full against a drawings package of £1,300 or more (inc VAT) ordered within 3 months.
The credit is applied to your build invoice, not paid out in cash. It does not apply if another company builds.
Where we stop
What we hand to independent specialists
- Beam, foundation and wall-removal calculations: an independent structural engineer designs and signs these. We introduce one and show you the fee before you commit. We do not receive a commission for the introduction.
- Party wall notices and awards: an independent surveyor acts under the Party Wall etc. Act 1996. We do not provide this service. We can introduce you to an independent party wall surveyor. We do not receive a commission for the introduction. You are free to choose any surveyor.
- Council and Planning Portal fees: paid by you directly. The 2026/27 fees are listed on the planning drawings page.
- Listed buildings, basements and structurally complex schemes: we do not take these on; a specialist design practice is the right route.
- Fixed electrics and gas: we draw and specify, a registered electrician or a Gas Safe registered engineer installs and certifies.
Next step
Three ways to start
Send us the address, a few photos and what you want to build or change, and we reply with a written quote after a short call.
Get a design quoteCost calculatorCall 07353 373753
Or message us on WhatsApp. Mon to Sat 8am to 10pm, Sun 8am to 6pm.
Questions
Design & Drawings: your questions
Do you measure the house yourselves?
Yes. A member of our team measures on site with a laser measurer and checks diagonals and level changes, then we draw from those numbers. Phone scans are fine for a first idea but we do not issue building regulations drawings from them.
Can you guarantee planning permission?
No. We prepare the drawings to give your application the best chance, but the decision is the council's and we cannot guarantee planning permission or building control approval. Councils aim to decide most householder applications within 8 weeks of validation; we do not control their timescale.
Do I have to build with Plumbery?
No. You can buy drawings only. The build credit applies only if you sign a build contract with us within the stated period.
Can another builder use my drawings?
Yes. Plumbery owns the copyright. Once you have paid in full, you have a non-exclusive licence to use the drawings for the planning application, building control and construction at the address stated, including by another builder.
Can I cancel after I order?
You can cancel within 14 days of the contract date. If you ask us to start within those 14 days, you pay for the work done so far, and you lose the right to cancel once the drawings have been fully delivered. We give you the cancellation form with your quote.
How long does it take?
Typically 5 to 7 days to book and complete the measured survey, then 2 to 3 weeks for a planning set, and 5 to 7 weeks for planning and building regulations together. Bathroom and kitchen design is typically 5 to 7 days after the survey. The council's decision time is separate.
What do I pay the council, and who pays it?
You do, directly. In England in 2026/27 a householder planning application is £548, a proposed lawful development certificate £274 and a prior approval for a larger home extension £249. Check your council, because fees are reviewed each year.
Do I need a structural engineer?
If the job removes or opens a load-bearing wall, adds a beam, or changes foundations, yes. We introduce an independent structural engineer and show you the engineer's fee separately, since the engineer works for you and signs their own calculations.
Plumbery LTD is a design-and-build contractor, not an architect's practice, and is not registered with the Architects Registration Board. Our drawings and designs are prepared in-house by Plumbery's own design staff.
Plumbery LTD holds business insurance, including professional indemnity cover for its design work. Details are available on request.
Everything on these pages is general information for homes in England, correct at the date of writing. It is not planning, legal or engineering advice for your property.
Why Plumbery
Qualified, insured and upfront about price
Every engineer we send is registered or qualified for the trade they work in, and you can check the details before anyone starts.
- Fully insuredEvery job is covered by our insurance.
- Rates published in advanceOur hourly rates are on the pricing page. Nothing starts until you agree the rate.
- Paperwork includedGas safety certificates and electrical records are provided on completion.
- Registered companyPlumbery Ltd, company no. 11677583, registered in England and Wales.
