Planning drawings

Planning permission drawings and loft conversion plans in London

A planning set for a rear extension, side return or loft: location plan at 1:1250, block plan at 1:500, and existing and proposed plans, elevations and sections at 1:50 or 1:100, drawn from our own measured survey. We also prepare lawful development certificate and prior approval packs when your project fits permitted development.

Call 07353 373753Get a design quote

  • Measured survey included in the price
  • Permitted development checked first
  • Council fee paid by you, shown below
HIGH STREETEXISTING HOUSEPROPOSED4 0003 000N010 m1:500BLOCK PLANSite boundary
Illustration only: a typical drawing, not a client project.

What is in the set

What a planning drawing set includes

  • Location plan

    Location plan at 1:1250 with your site outlined in red and any other land you own in blue, a north point and two named roads.

  • Block plan

    Block plan at 1:500 showing boundaries, the existing and proposed footprint, distances to each boundary, access, trees and drainage routes.

  • Existing floor plans

    Existing floor plans for every floor, at 1:50 or 1:100, with room names, wall thicknesses, windows, doors and stairs.

  • Proposed floor plans

    Proposed floor plans on the same scale, with new walls hatched, demolition dashed and habitable room areas in m².

  • Elevations

    Existing and proposed elevations of every side the work touches, with material callouts, ridge and eaves levels and the neighbour's outline dashed.

  • Sections

    At least two sections: one through the stair and one through the extension or loft, with floor-to-ceiling heights.

  • Design and access statement

    A one-page design and access statement covering materials, neighbours and the 45-degree test. Conservation areas and listed buildings need a full one.

  • Form and sheet details

    A completed application form for you to check and sign. Every sheet carries a north point, scale bar, sheet number, revision and date.

Permitted development

The numbers that decide whether you need planning permission

Rear extension, single storey

Up to 3 m beyond the original rear wall on a terraced or semi-detached house and 4 m on a detached house, maximum 4 m high, and no more than 50% of the land around the original house covered.

Larger home extension

3 to 6 m on a terraced or semi-detached house and 4 to 8 m on a detached house can go through the prior approval route. The council consults your neighbours. It is not available in conservation areas, AONBs, National Parks, the Broads or World Heritage Sites.

Side extension

Single storey only, maximum 4 m high and no wider than half the width of the original house. Any side extension, and any multi-storey rear extension, needs planning permission on article 2(3) land such as a conservation area.

Loft conversion

Added roof volume up to 40 m³ on a terraced house and 50 m³ on a detached or semi-detached house, including earlier enlargements. Not higher than the existing ridge, 20 cm set back from the original eaves where practicable, no dormer on a front slope facing a road, and no balcony or raised platform.

Where the rules do not apply

Flats, maisonettes, listed buildings, houses where a planning condition or Article 4 direction removed these rights, and loft enlargements in conservation areas need a planning application. Many central London boroughs have Article 4 areas, so we check your street on the borough map.

Which route

Permitted development, prior approval or planning permission

A project within the limits above can go ahead without a planning application, but a lawful development certificate from the council confirms it in writing. Buyers' solicitors and lenders ask for that paper years later, so we recommend one for every permitted development job.

Rear extensions between 3 and 6 m (or 4 and 8 m on a detached house) go through prior approval. Side extensions, two-storey rear extensions, mansard lofts and anything in a conservation area or on a flat need a householder application, where the council also weighs design, overlooking and daylight to neighbours' windows. We write the route and the numbers on the front sheet so you can see why it was chosen.

These are general rules for houses in England. Your property may differ, and the council has the last word.

Side by side

Planning drawings versus building regulations drawings

Planning drawings

  • Judge appearance and impact: height, materials, neighbours, street scene.
  • Scales 1:1250, 1:500 and 1:50 or 1:100.
  • Can leave the wall build-up as "brick and block".
  • Council decision: typically 8 weeks from validation.

Building regulations drawings

  • Judge safety and performance: structure, fire, damp, ventilation, drainage, stairs, energy.
  • Construction details at 1:5 to 1:20 and a written specification.
  • Must state insulation thickness, lintels and drain falls.
  • Needed for almost every extension and every loft conversion, even without planning.

Prices

Planning drawing prices, inc VAT, measured survey included

ItemFrom, inc VATWhat is included
Rear single-storey extensionfrom £1,400Existing and proposed plans, elevations, sections, location and block plans.
Side-return extensionfrom £2,060Existing and proposed plans, elevations, sections, location and block plans.
Wraparound extensionfrom £2,355Existing and proposed plans, elevations, sections, location and block plans.
Two-storey extensionfrom £2,200Existing and proposed plans, elevations, sections, location and block plans.
Loft: rooflight or rear dormerfrom £1,400Plans, elevations and sections of the existing and proposed loft.
Loft: hip-to-gablefrom £1,610Plans, elevations and sections of the existing and proposed loft.
Loft: mansardfrom £2,100Plans, elevations and sections of the existing and proposed loft.
Garage conversionfrom £690Planning is needed only where permitted development has been removed.
Lawful development certificate packfrom £975Drawings, application form and a short statement with the permitted development calculations.
Prior approval pack, larger home extensionfrom £1,520Includes the neighbour-facing drawings the council asks for.
Measured survey only, flatfrom £395Bought on its own, 1 to 2 bedroom flat. Included in every drawings package.
Measured survey only, housefrom £535Bought on its own, 2 to 3 bedroom house. Included in every drawings package.

Prices include VAT at 20%. Your written quote confirms the final figure after we have seen the property. Two rounds of changes are included. A measured survey bought on its own is credited in full against a drawings package of £1,300 or more (inc VAT) ordered within 3 months.

Fees to the council

What you pay the council, on top of our fee

These are paid by you directly to the council or through the Planning Portal, not to Plumbery. Amounts are for 2026/27 in England; check your council because fees are reviewed each year.

Householder planning permission is £548. A proposed lawful development certificate is £274, which is half the householder fee. A prior approval application for a larger home extension is £249. If you apply through the Planning Portal it may add its own service charge. Neighbours are consulted for 21 days on a householder application, and councils aim to decide within 8 weeks of validation.

Beam calculations come from an independent structural engineer. Party wall notices, where your work is on or near a boundary, go through an independent surveyor; we do not provide party wall services. We can introduce you to an independent party wall surveyor. We do not receive a commission for the introduction.

Timing

How long planning drawings typically take

  1. Survey

    Typically 5 to 7 days from your go-ahead.

  2. Drawings and two rounds of changes

    Typically 2 to 3 weeks after the survey.

  3. Submission

    You sign the form, ownership certificate and pay the fee. With your written authority we can submit it.

  4. Council decision

    Councils aim for 8 weeks from validation. We do not control their schedule.

Next step

Three ways to start

Send the address, a few photos and the project you have in mind. Not sure whether you need planning at all? Start with a number for the build.

Get a design quoteCost calculatorCall 07353 373753

Build it too

From approved drawings to the build

We draw for houses and straightforward flats. For listed buildings, basements and structurally complex schemes we recommend a specialist design practice.

After approval, our house extension and loft conversion teams can build exactly what was drawn, and the building regulations drawings come next.

Questions

Planning drawings London: your questions

Do I need planning permission for a rear extension?

Not always. Up to 3 m deep (4 m detached) is often permitted development on a house outside a conservation area, and deeper extensions go through prior approval. Flats, listed buildings and Article 4 areas need an application. We check your property first.

Can I convert my loft without planning permission?

Often, if the added volume stays within 40 m³ (terraced) or 50 m³ (other houses) and nothing rises above the ridge. Conservation areas and flats are excluded. Building regulations approval is always needed.

What is a lawful development certificate and do I need one?

It is the council's written confirmation that your project is lawful under permitted development. It is optional, but buyers' solicitors and lenders often ask. A proposed certificate costs £274 for a householder in 2026/27, check your council.

What is the difference between planning drawings and building regulations drawings?

Planning drawings show the council how the building looks and affects neighbours. Building regulations drawings show construction detail: structure, insulation, fire, ventilation and drainage.

Is the measured survey included in the price?

Yes. Prices above include the measured survey. A survey ordered alone is priced separately and credited in full against a drawings package of £1,300 or more ordered within 3 months.

Do you submit the application for me?

With your written authority, yes. You are the applicant, you pay the fee and you sign the ownership certificate, which must be true. We cannot sign it for you.

What are architectural drawings, and which ones do I need?

The term covers plans, elevations, sections and details of a building. For a house extension or loft you need the planning set described above, and later the building regulations set. You do not need an architect to prepare them. "Architect" is a protected title in the UK, and our designers are not architects.

What if the council refuses?

The decision is the council's, and we cannot guarantee planning permission. Tell us the reasons and we quote the drawing changes needed. We do not run appeals.

Plumbery LTD is a design-and-build contractor, not an architect's practice, and is not registered with the Architects Registration Board. Our drawings and designs are prepared in-house by Plumbery's own design staff.

Plumbery LTD holds business insurance, including professional indemnity cover for its design work. Details are available on request.

Everything on these pages is general information for homes in England, correct at the date of writing. It is not planning, legal or engineering advice for your property.

Why Plumbery

Qualified, insured and upfront about price

Every engineer we send is registered or qualified for the trade they work in, and you can check the details before anyone starts.

  • Fully insuredEvery job is covered by our insurance.
  • Rates published in advanceOur hourly rates are on the pricing page. Nothing starts until you agree the rate.
  • Paperwork includedGas safety certificates and electrical records are provided on completion.
  • Registered companyPlumbery Ltd, company no. 11677583, registered in England and Wales.