Building regulations drawings

Building regulations drawings for extensions and lofts in London

Planning permission says you may build. Building regulations drawings show building control how it will be built: wall and roof build-ups, insulation, fire doors and escape windows, ventilation rates, drainage falls and where the engineer's steel goes. Building control checks the work against them before it issues the completion certificate.

Call 07353 373753Get a design quote

  • Written for building control and for builders
  • Beams designed by an independent engineer
  • Also available with planning drawings as one set
InsulationOuter leafDamp-proof courseFoundationInner leafFloor slabSECTION A-A1:10
Illustration only: a typical drawing, not a client project.

Two different approvals

Building regulations are not planning permission

Planning

Judges appearance and impact: height, materials, neighbours, street scene. A planning drawing can leave the wall build-up as 'brick and block'.

Building regulations

Judge safety and performance: structure, fire, damp, ventilation, drainage, stairs, energy. The drawing has to say how thick the insulation is, which lintel carries the opening and where the drain falls.

Both can apply

A permitted development extension needs no planning application but almost always needs building regulations approval. A loft, a knocked-through kitchen wall and a new shower room waste pipe all fall under building regulations even when planning is not needed.

What is inside

What a building regulations pack contains

  • Structure plans and sections

    Plans and sections that show the structure: foundations (depth set by the engineer), joist and beam positions, padstones, wall type, roof build-up and insulation thickness.

  • Construction details

    Construction details at 1:5 to 1:20: eaves, floor-to-wall junction, junction with the existing house, window head and cill, and fire barriers.

  • Written specification

    A written specification: blockwork, damp-proof course, cavity and lintel types, insulation product and thickness, window performance and ventilation, fire doors, smoke alarms, stair dimensions and drainage materials.

  • Fire sheet

    Fire sheet: for a loft above two storeys, protected stair route, FD30S doors, mains-linked smoke alarms and an escape window with an opening of at least 0.33 m², no dimension under 450 mm and a bottom edge no higher than 1,100 mm.

  • Stair check

    Stair check: maximum rise 220 mm, minimum going 220 mm, headroom 2.0 m (1.9 m on the centre line of a loft stair).

  • Ventilation schedule

    Ventilation schedule by room: for example 15 l/s intermittent extract for a bathroom, 30 l/s for a kitchen with a hood, and a 15-minute overrun for rooms without a window.

  • Drainage layout

    Drainage layout at 1:100 with falls, manholes and the 100 mm foul run, and a marker where building within 3 m of a public sewer needs a build-over agreement.

  • Energy and electrical notes

    Energy information for Part L, and a list of notifiable electrical work for Part P.

  • Structural interface

    The structural interface: beam schedule and notes for the engineer's calculations. We do not size beams and never sign structural calculations.

The structural engineer

Why the beams come from someone else

When you remove a chimney breast, open the back of a terrace or add a dormer, a beam carries what the wall carried. Sizing it is structural engineering work. An independent structural engineer calculates the beams and foundations and signs the calculations; we draw the result into the pack.

We introduce an engineer, you hire them, and their fee is shown as its own line, so you can compare it. Building control will not approve a loft or a wall removal without those calculations.

Building control

Full Plans or Building Notice, and who checks it

Your council or a registered building control approver does the checking. For most extensions and lofts we prepare a Full Plans application, so comments arrive before you build, not after the wall is up. A Building Notice skips the drawing check and suits only small, simple work.

The inspector visits at set stages: foundations, damp-proof course, drainage before it is covered, roof structure and a final inspection that leads to the completion certificate, which you will need when you sell. We draft the application and you authorise it. Fees are paid by you and vary by borough and project size.

Who is responsible

Principal designer and principal contractor, in writing

Since 1 October 2023, Part 2A of the Building Regulations 2010 gives domestic projects named dutyholders as well as the roles already set by CDM 2015. Without an appointment, the law assigns them by default.

When Plumbery both draws and builds, you appoint us as principal designer and principal contractor in the contract, and we accept those duties in writing. We keep a risk register for the drawings, pass pre-construction information to the builders and tell you in writing if either role changes.

Prices

Building regulations drawing prices, inc VAT

ItemFrom, inc VATWhat is included
Rear single-storey extensionfrom £1,340Construction details, specification, fire, ventilation and drainage.
Side-return extensionfrom £1,970Construction details, specification, fire, ventilation and drainage.
Wraparound extensionfrom £2,255Construction details, specification, fire, ventilation and drainage.
Two-storey extensionfrom £2,105Construction details, specification, fire, ventilation and drainage.
Loft: rooflight or rear dormerfrom £1,400Structure interface, protected stair route, fire doors and escape window.
Loft: hip-to-gablefrom £1,540Structure interface, protected stair route, fire doors and escape window.
Loft: mansardfrom £2,010Structure interface, protected stair route, fire doors and escape window.
Garage conversionfrom £785Insulation, damp, ventilation and fire details for the new room.
Planning and building regs together: rear extensionfrom £2,465One survey, one set of base drawings for both applications.
Planning and building regs together: side return, wraparound or two-storeyfrom £3,630One survey, one set of base drawings for both applications.
Planning and building regs together: loft dormerfrom £2,465One survey, one set of base drawings for both applications.

Prices include VAT at 20%. Your written quote confirms the final figure after we have seen the property. A measured survey bought on its own is credited in full against a drawings package of £1,300 or more (inc VAT) ordered within 3 months. Not included: the structural engineer's fee, building control or approver fees, party wall costs and any council planning fee. Each is shown to you before you commit. If your project needs them, we introduce the independent engineer or party wall surveyor. We can introduce you to an independent party wall surveyor. We do not receive a commission for the introduction. We do not receive a commission for introducing a structural engineer.

Combined set

Planning and building regulations together

Buying both in one go saves a second survey and means the planning drawing and the construction drawing agree with each other. It makes sense when you are certain to build, because planning approval sometimes comes with conditions that change a detail the construction drawings should already reflect.

If you are not yet sure you need planning permission, begin with the planning drawings and add this pack once the council has answered.

Next step

Three ways to start

Send the address, the project and any drawings you already have. Want the build cost first? Try the calculator.

Get a design quoteCost calculatorCall 07353 373753

Build it too

From approved drawings to the build

Once the drawings are approved, our house extension and loft conversion teams build from them.

Questions

Building regulations drawings London: your questions

Do I need building regulations drawings for an extension?

Almost always. Nearly every extension needs building regulations approval, even a permitted development extension that needs no planning permission; small porches and some conservatories are exempt. Building control needs the drawings to check the foundations, insulation, fire, ventilation and drainage.

Is a loft conversion under building regulations?

Yes. A loft needs structural calculations for the new floor and steel, a protected stair route, fire doors, linked smoke alarms, an escape window and current insulation standards.

How much do building regulations drawings cost in London?

Our prices are shown above and include a measured survey. They vary by project type, and the structural engineer, building control and party wall costs are separate.

Does a bathroom or kitchen refit need building regulations?

A like-for-like refit with no structural change usually does not need a building regulations application. A new circuit falls under Part P, a new fan or soil pipe through an external wall under Parts F and H, and moving or removing a wall needs a structural engineer.

Do you design the steel beams?

No. An independent structural engineer calculates and signs the beams and foundations. We draw them into the pack and coordinate details with the engineer.

Full Plans or Building Notice?

Full Plans for most work: building control checks the drawings and decides before you build. A Building Notice suits only small, simple work.

Do you handle the party wall notice?

We do not provide party wall services. An independent party wall surveyor acts under the Party Wall etc. Act 1996. Notice is required at least 2 months before work on a party structure and at least 1 month before excavation within 3 m of a neighbouring building that goes deeper than its foundations (within 6 m in some cases). We can introduce a surveyor. We can introduce you to an independent party wall surveyor. We do not receive a commission for the introduction.

How long does it take?

Typically 2 to 4 weeks after the planning set is agreed, or 5 to 7 weeks for planning and building regulations together from the survey. Building control's timescale is separate.

Plumbery LTD is a design-and-build contractor, not an architect's practice, and is not registered with the Architects Registration Board. Our drawings and designs are prepared in-house by Plumbery's own design staff.

Plumbery LTD holds business insurance, including professional indemnity cover for its design work. Details are available on request.

Approved Documents are revised regularly; we draw to the edition in force on the date of your application. This page is general information for homes in England, not engineering advice for your property.

Why Plumbery

Qualified, insured and upfront about price

Every engineer we send is registered or qualified for the trade they work in, and you can check the details before anyone starts.

  • Fully insuredEvery job is covered by our insurance.
  • Rates published in advanceOur hourly rates are on the pricing page. Nothing starts until you agree the rate.
  • Paperwork includedGas safety certificates and electrical records are provided on completion.
  • Registered companyPlumbery Ltd, company no. 11677583, registered in England and Wales.